Item 1420

MAKE: SynchroLite ~ Rotor - Hub - 3-blade - CVJ & HS - Crown Assembly

Drawing:

 

 

Bill of Material 1420

Notes:

XXX

Could use some of the notes from Robinson's Maintenance Manual Section 9.x

Sequence of Assembly: To make sure that the rotor can be assembled.

Instalation of parts into Crown [Item 1379]

    1. Insert seal [Item 1398] into crown.
    2. Inset 2 angular bearings [Item 0987] into Crown.
    3. Insert Grip [1397] into bearings.
    4. Tread Nut onto Grip. Tighten to ---.
    5. Inset axial bearing into Crown [1379] and onto Grip.
    6. Install O-ring onto End-cap.
    7. Insert End-cap assembly into Crown
    8. Lock End-cap with ----- No part or part number yet

Back to top | SynchroLite Home Page | UniCopter Home Page | Nemesis Home Page

Last Revised: Friday, January 19, 2005